Industrial Capabilities

Precision Manufacturing Workflow

From certified raw sheet metal to audited cGMP cleanroom equipment. Explore the systematic engineering protocols powering our 15,000+ sq. ft. fabrication facility in Baddi, Himachal Pradesh.

URS & Requirements Modeling
STAGE 01
01

URS & Requirements Modeling

Collaborative analysis of user requirement specifications (URS). Our engineering team reviews facility air classifications (ISO 5, 7, 8), chemical compatibility, dimensional limitations, and ergonomic operator requirements.

Key Quality Checkpoints:
ISO 14644-1 Evaluation
Chemical & Solvent Exposure Analysis
Spatial Layout 3D Verification
Parametric CAD & Airflow Simulation
STAGE 02
02

Parametric CAD & Airflow Simulation

Using high-end 3D CAD modeling, our draftsmen prepare comprehensive General Arrangement (GA) drawings. For fume hoods and laminar airflow pass boxes, airflow velocity and turbulence vectors are computationally simulated.

Key Quality Checkpoints:
3D SolidWorks General Arrangement
CFD Airflow Simulation
Client Engineering Sign-Off
CNC Fiber Laser Cutting & Forming
STAGE 03
03

CNC Fiber Laser Cutting & Forming

Raw stainless steel sheets (AISI 304 / 316L) are cut using ultra-precise CNC fiber laser technology, yielding clean, oxide-free edges with zero thermal warping. Multi-axis hydraulic press brakes execute uniform radius bends.

Key Quality Checkpoints:
Cutting Accuracy: ±0.1 mm
Clean Bur-Free Edge Finish
Radiused Coved Corner Bending
Sanitary Purged TIG Welding
STAGE 04
04

Sanitary Purged TIG Welding

Pharma-grade fabrication requires eliminating bacteria-trapping crevices. Our certified technicians use argon-backed Tungsten Inert Gas (TIG) and automated orbital welding to achieve complete 100% root penetration.

Key Quality Checkpoints:
High Purity Argon Gas Backing
Zero Crevice Root Pass
Dye Penetrant Testing (DPT)
Electropolishing & Micro-Finishing
STAGE 05
05

Electropolishing & Micro-Finishing

To satisfy strict cGMP standards, all pharmaceutical contact surfaces are chemically passivated and electropolished. This minimizes surface roughness to Ra < 0.4 µm, drastically inhibiting microbial biofilm adhesion.

Key Quality Checkpoints:
Ra Value < 0.4 µm (15 µ-inch)
ASTM A967 Chemical Passivation
Specular Mirror or Uniform Satin
Quality Assurance & FAT Documentation
STAGE 06
06

Quality Assurance & FAT Documentation

Before dispatch from our Baddi plant, every unit undergoes a comprehensive Factory Acceptance Test (FAT). We provide complete qualification dossiers including DQ, IQ, and OQ validation protocols.

Key Quality Checkpoints:
Mill Test Certificates (MTC 3.1)
Digital Calibrated Ra Profiling
Full FAT / DQ / IQ / OQ Protocols

Factory Machinery & Infrastructure

High-precision capital equipment deployed at our Baddi manufacturing facility

Equipment / SystemWorking Envelope / CapacityCalibrated PrecisionPharma Manufacturing Role
CNC Fiber Laser Cutting SystemUp to 6mm Stainless Steel±0.05 mmPrecision blanking and perforated panels
CNC Multi-Axis Hydraulic Press Brake100 Tons / 3100 mm±0.2 DegreeFlawless radius bending and clean coving
Sanitary Orbital TIG Welding StationsPure Argon ShieldedFull PenetrationAseptic jointing without oxidation
Automated Electropolishing TanksMulti-stage acid bathRa < 0.2 to 0.4 µmSurface passivation and micro-smoothing
Mitutoyo Surface Roughness TesterDigital Ra, Rz, RqCalibrated NABL100% certified surface finish validation
Factory Audits & Factory Acceptance Testing (FAT)

Schedule a Technical Visit to Our Baddi Works

We welcome QA/QC auditors, procurement heads, and cleanroom design engineers to inspect our welding quality, surface profilometry, and work-in-progress cleanroom pass boxes in person.